I know this is a daft question but I'm wondering how the top of the Yankee furler should connect to the halyard. Do you just run the halyard through the metal fitting and tie off with a half hitch or bowline?
Thanks
Daft question
-
Ru88ell
- CC19 Association Member
- Posts: 598
- Joined: Thu Aug 26, 2010 5:48 pm
- Location: Stourbridge
-
Killick Greenie
- Non Association Member
- Posts: 61
- Joined: Sat Jun 22, 2013 8:24 pm
-
Ru88ell
- CC19 Association Member
- Posts: 598
- Joined: Thu Aug 26, 2010 5:48 pm
- Location: Stourbridge