107 viewsHome made chart table (a la "Zephyr"). Note the "off duty" crew ;)
93 viewsTowing away for our first holiday aboard
83 viewsModified lighting board with easy fitting and removal and added side lights.
77 viewsSwimming in Church Bay, Holyhead
77 viewsPotential VHF and nav light deck socket position. Cables to be run along conduit inside coach roof into stbd cupboard void. Sockets could foul ropes?
This is what we opted for in the end. Hasn't fouled any ropes so far...
73 viewsMk1 Dashboard under construction (fitted to stbd cabin wall, now replaced by mk2 with bookshelf).
72 viewsGulp! Drilling a 42mm hole in the hull (for log impeller). Stbd side, under cockpit.
70 viewsProud crew member, Holyhead marina
70 viewsRather than fit a flagstaff to the stern or tiller, I have decided to fly the ensign from the gaff head.
66 viewsBattery and charger fitted behind companionway step
65 viewsTaking the ground, Bembridge October 2012
65 viewsLunch at Pensarn (Shell Island), Mar 2013
62 viewsMotoring into Bembridge, Oct 12
60 viewsSometimes the channel markers do not indicate enough water to float....